
Guides
Guides for commercial and site teams
Plain answers to the questions that come up on interior finishes and facade projects.
All guides
GuideBuilding Safety Act: What Subcontractors Must Know
Regulations 11A onwards of the Building Regulations 2010 put competence and information duties on every contractor, including specialists delivering one trade.
GuideGateway 2, Gateway 3 and the Golden Thread Explained
GOV.UK guidance lists the documents behind Gateway 2 and Gateway 3, and the golden thread is the digital record that ties them together.
GuideSFS or Blockwork for External Infill Walls
A fair comparison of light steel infill and blockwork prices the same build-up on both sides and checks movement and wind at the structure.
GuideDry Lining or Wet Plaster: How to Choose
The choice between direct bond dry lining and wet plaster turns on the background, the specified build-up and how much drying the programme can absorb.
GuideWhy Partitions Fail Part E Sound Tests
Most failures trace to gaps, rigid links and missing absorbent material at junctions, all of which Approved Document E and SCI guidance describe.
GuideHow Long Screed Takes to Dry Before Floor Finishes
Screed drying is quoted at about 1 mm a day, but the cut-off thickness differs by source and only a moisture test shows when a floor is ready.