Screeding
The right screed for what the floor has to do
Screeds and insulation laid for main contractors, including multi-storey buildings and sites with difficult access.
A hospital corridor and a floating floor in an apartment ask very different things of a screed. Cracking in the wrong place can mean a high cost in lost use.
We choose the system around the floor build-up, the access and how soon the next trade needs to start.
Screeds we lay
| Screed | Suited to |
|---|---|
| Standard and early strength screeds | Conventional applications, including floating, bonded, unbonded and monolithic floors |
| Tarmac Tufscreed | Hospitals, offices, superstores and industrial floors, where failure from surface cracking would be costly |
| Fibre screed | Conventional applications where you want to reduce light mesh and keep reinforcement correctly distributed |
| SBR polymer screed | Refurbishment work, solid concrete ground slabs and in-situ suspended floors, where extra toughness and bond are needed |
Also included
- Insulation installation
- Concrete pumping for multi-storey buildings
- Pumping for sites with difficult access
Common questions
How long does screed take to dry?
It depends on the material, the thickness and the conditions. Our guide covers drying times and how moisture is tested.
Can screed be pumped to upper floors?
Yes. We provide concrete pumping where needed, so multi-storey buildings and sites with access difficulties can be completed.
Do you install the floor insulation too?
Yes. Insulation installation is part of what we offer alongside the screed.
What is floor screed for?
Screed is a cement or calcium sulphate based layer laid over a structural floor to create a smooth, level surface. Almost every tile, timber, vinyl or resin finish needs a sound, flat base underneath it, and a properly laid screed provides exactly that.
Often delivered with
ServiceDry Lining
Walls, linings and ceilings for every sector.
ServicePlastering
Hand, machine and lime finishes.
GuideHow Long Screed Takes to Dry Before Floor Finishes
Screed drying is quoted at about 1 mm a day, but the cut-off thickness differs by source and only a moisture test shows when a floor is ready.