HomeAbout
ServicesAll servicesDry LiningPartitioningSteel Framing (SFS)ScreedingPlasteringSuspended CeilingsAcoustic SolutionsTape and JointingExternal RendersFire ProtectionHeritage & RefurbishmentsFacades
ProjectsSectorsHow we workAccreditationsGuidesWork with usContact
Film House office and studio development in central London, interior finishes by MDG

Commercial

Film House

A Modern Cinematic Experience

LocationLondon
ClientBlenheim House Construction
SectorCommercial
Contract valueOver £2.5m

Project overview

Film House is a modern development in the heart of London, providing office and studio spaces with a focus on flexibility and creativity. MDG was appointed to deliver essential interior finishes, including dry lining, plastering, partitioning, and suspended ceilings. The project aimed to create a dynamic, functional environment suitable for film production and creative industries, offering state-of-the-art facilities in a prime location.

Film House, London

Scope of work

Dry Lining

Installation of high-quality dry lining systems throughout the building to provide smooth, durable wall finishes, ideal for both office and studio spaces.

Partitioning

Partitioning carried out to create adaptable office layouts and production areas, allowing businesses to customise spaces as required.

Suspended Ceilings

Suspended ceilings installed in key areas, such as production rooms, offices, and common spaces, to provide a modern finish while addressing acoustics and lighting needs.

Plastering

Modern and traditional plastering techniques applied to achieve high-quality, smooth surfaces, enhancing the aesthetic appeal of the spaces.

Film House, London

Challenges

Creative Space Design

Ensuring the building's design was flexible enough to accommodate both office spaces and creative film production areas, while maintaining functionality and modernity.

Acoustic Requirements

Given the nature of the space, achieving high acoustic standards was critical to ensure that both office areas and studios met the needs of the film production industry.

Time Constraints

The project had strict deadlines, and MDG had to work efficiently to ensure timely completion while maintaining high-quality standards.

Outcome

MDG's expert work in dry lining, plastering, partitioning, and suspended ceilings helped bring Film House to life as a cutting-edge, flexible space designed for creative professionals. The building now offers modern, functional workspaces and studios, catering to the diverse needs of the film and creative industries in a prime London location.